Soil Testing

What is the time required for soil or plant analysis?

Generally, it takes 3 to 5 working days to complete a soil analysis through the soil testing laboratory. The turn around time is effected by seasonal sampling and instrument failures.

 

MSU Extension Accessibility Accessibility Team